I swiped these instructions from another ford forum and am very grateful to them for posting this procedure.
First, you must have your VIN. If you enter the VIN and the numbers "30.11.0002" appear in the build date box, your Transit has not yet been built.
Here goes - For those wanting to get a copy of your window sticker, please use the handy tool here. Enter your VIN and you will be able to print out your Window Sticker if the vehicle has been built.
Once you get your VIN. it is on average about two weeks till your car is built give or take any shortages or limited parts for certain options..
FordETIS look up
Here you can see the Factory Build date once your car is scheduled (the date will look wonky till then) and what your car has for options (note there is a delay from the time your car is built to the time the info appears of a few days)
First, you must have your VIN. If you enter the VIN and the numbers "30.11.0002" appear in the build date box, your Transit has not yet been built.
Here goes - For those wanting to get a copy of your window sticker, please use the handy tool here. Enter your VIN and you will be able to print out your Window Sticker if the vehicle has been built.
Once you get your VIN. it is on average about two weeks till your car is built give or take any shortages or limited parts for certain options..
FordETIS look up
Here you can see the Factory Build date once your car is scheduled (the date will look wonky till then) and what your car has for options (note there is a delay from the time your car is built to the time the info appears of a few days)