Ford Transit USA Forum banner
1 - 9 of 9 Posts

· Registered
Joined
·
209 Posts
Has anyone fastened additional D rings to the floor of the transit?
Was wondering how structural it is?
Want to do at same time I put my floor in?

Don't know if this is helpful but in my van there were two unused D-ring attachment points between the B and C pillars/bulkheads. When I put in my partition I had two extra D-rings from the B bulkhead so I moved those to the unused locations preserving the total of 11 D-rings. A long WB, extended van without a partition has attachment points for 13. Beyond that you're on your own, but I believe you could fabricate some doublers with nut plates, riv-nuts, or some such, and bolt or rivet them in. I would imitate whatever structure the existing attachment points use. --Frank
 

· Registered
Joined
·
296 Posts
Discussion Starter · #4 ·
agreed.
Was going to put something on underneath
Has anyone on here done that ?

I have these large ABS cases, 35x55x30" high, 800 lbs
Cant seem to find a good strapping section in the van, wanted to put 4 D rings down the middle, which would be be great, but would have to take some weight.
Really don't want to drill holes in my new floor...
Do they make cargo nets that can sinch down and tie off items on our corner existing rings?
 

· Registered
Joined
·
209 Posts

· Registered
Joined
·
296 Posts
Discussion Starter · #7 ·
looks interesting, would need to find out about weight for sure
I wanted to send you the link to these cool cases, guess I am still a youngster on this site
So much info to share, but not old enough yet
How many links must I post before I can play:)
 
1 - 9 of 9 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top