Now that I'm back at work progress has slowed down a bit. At least we managed to get the insulation done:
We also have re-fitted the ply that we want back on the walls.
We were about to fit the 4 way stretch carpet and then realised that it will be easier to build the furniture and get all of the connections into the body sorted. Then take it out and fit the carpet.
This isn't as mad as it sounds. The furniture is all being built with 8020 so is easy to unbolt and remove.